Home Grey Structure Construction in Lake City Lahore

Grey Structure Construction in Lake City Lahore

Foundation · RCC Frame · Brick Masonry · Roof Slab · Boundary Wall | All M1–M8 Blocks & Lake City Meadows | B-25 Concrete | BOQ Fixed Price

Get Free Estimate 📞 +92 322 999 9450
PKR 2,850+Grey Structure /sqft
B-25Minimum Concrete Grade
Fixed PriceBOQ Contract
9–12 Months10 Marla (G+1)
Full Scope

Grey Structure — What LCB Builders Delivers

Grey structure is the structural skeleton of a building — everything from soil investigation to the completed roof slab. LCB Builders makes every specification explicit: every material named in the BOQ, concrete cube tests at time of pouring, reinforcement photographed before each pour.

Everything Included in LCB Grey Structure

  • Soil Investigation — borehole test to determine soil bearing capacity
  • RCC Foundation — raft or strip per structural design, B-25 concrete, Grade 60 steel
  • RCC Frame — columns, beams, floor slabs — cube tests shared at every pour
  • Brick Masonry — 9-inch external walls, 4.5-inch internal partitions
  • Plaster — internal 15mm sand-cement, external waterproof admixture plaster
  • Staircase Structure — RCC waist slab and steps
  • Roof Slab — RCC flat roof with parapet walls
  • Roof Waterproofing — bituminous membrane included standard
  • Boundary Wall — full height, plastered both sides, coping, gate pillars
  • LDA Drawings & Approval — included in all LCB grey structure contracts

Construction Costs — Lake City 2025

Plot SizeGrey Structure (G+1)Turnkey StandardTurnkey LuxuryTimeline
5 MarlaPKR 56–65LPKR 90L–1.10CrPKR 1.10–1.35Cr6–9 months
7 MarlaPKR 79–91LPKR 1.26–1.45CrPKR 1.58–1.80Cr7–10 months
10 MarlaPKR 1.13–1.30CrPKR 1.80–2.10CrPKR 2.25–2.70Cr9–12 months
12 MarlaPKR 1.35–1.56CrPKR 2.16–2.52CrPKR 2.70–3.15Cr10–13 months
1 KanalPKR 2.25–2.60CrPKR 3.60–4.20CrPKR 4.50–5.40Cr12–15 months
Basement add-onPKR 800–1,200/sqft+2–3 months

B-25 Concrete — What It Means

B-25 means the concrete mix achieves a minimum compressive strength of 25 N/mm² (approximately 3,500 psi) at 28 days. LCB Builders takes cube samples at every major structural pour and shares 7-day and 28-day test results with the client. This is standard practice in our contracts — not an upgrade.

Grade 60 Steel

All reinforcement bars are Grade 60 (420 MPa) deformed bars. Mill certificates and delivery receipts are kept on file. LCB Builders does not use sub-standard or recycled steel in any project.

★★★★★

"Concrete cube tests at every pour, results shared with us. That level of transparency is rare in Lake City. Grey structure completed in 10 months for our 10 Marla."

— Naveed Ahmed, Lake City M2
FAQ

Grey Structure Construction in Lake City Lahore FAQ

Grey structure includes soil investigation, RCC foundation, complete RCC frame (columns, beams, slabs), brick masonry, plaster, staircase structure, roof slab, roof waterproofing, boundary wall with gate pillars, and LDA drawings. It does not include flooring, tiles, paint, kitchen, bathroom fittings, doors, windows, electrical, or plumbing.

LCB Builders uses minimum B-25 (3,500 psi / 25 N/mm²) concrete for all structural RCC work. Independent cube tests are done at every major pour — results shared with the client at 7 and 28 days. All steel is Grade 60 (420 MPa) deformed bar.

Grey structure for a 10 Marla G+1 in Lake City takes approximately 9–12 months. A 1 Kanal G+1 takes 12–15 months. Adding a basement adds approximately 2–3 months. LCB Builders provides a written milestone schedule with every contract.

Yes. Grey structure only is a very common choice. Many clients prefer to manage their own finishing, import materials, or build in phases. LCB Builders provides grey structure contracts with no obligation to use us for finishing.

Yes. All LCB Builders grey structure contracts include LDA map drawings and first-attempt submission. We handle the Lake City Holdings NOC as well. You visit no government office.

All Locations

Other Lake City Blocks We Build In

Building in Lake City from Abroad?

We manage complete projects for overseas Pakistanis — LDA approval, weekly site videos, milestone payments, dedicated WhatsApp project manager.

  • ✅ 3D design approval from UK / UAE / USA / Canada
  • ✅ LDA map approval — our team handles everything
  • ✅ Weekly Friday site video — without you asking
  • ✅ Pay only on verified milestone completion

Get a Free Construction Estimate

Free itemized BOQ within 48 hours. No commitment required.